Hauptinhalt

Hauptinhalt

EWS Sonnenfeld Pellendorf (NÖ)

Gugelsolar GmbH has planned, delivered and implemented an agrivoltaic plant in the municipality of Gaweinstal in Lower Austria with EWS as EPC contractor. Together with four wind turbines, for which EWS also handled the construction management, this is the first hybrid park of its kind to generate green electricity.

Yield data EWS Sonnenfeld Pellendorf

  • 3,2 ha agricultural use - 80 %
  • 0,72 ha for increasing biodiversity (flower strips, bee pastures, fallow land) - 18 %
  • 0,08 ha for solar power production - 2 %

Annual electricity production: 4.267 MWh
Energy for 1.219 households (household electricity)
CO2 savings in 25 years of 95.216 t

Status: 2023 start of regular operations

Project folder for download (in German)

Yield data Gugelberg wind farm

3 x Vestas V112, hub height 143m, 3.3 MW each (2017)
1 x Vestas V162, hub height 169m, 6.2 MW (2023)

Annual electricity production: 44,300 MWh
Energy for 14,700 households (household electricity)

The combination of wind energy and agri-PV has several advantages:

  •     Maximum increase in yields through triple utilisation of the area
  •     Maximum utilisation of available grid capacities and integration stations
  •     Cost savings through joint utilisation/procurement of cable infrastructure and grid transmission
  •     Increased grid stability through stabilisation of annual electricity production
  •     Maximum system compatibility for power grids and self-consumption systems
  •     Optimised operational management through higher-level PV and wind farm control
  •     Rapid and cost-effective implementation with minimal land consumption

Am I ready for hectares of solar power?

Request your free land check now!

An area of at least 5 hectares in size should not be a problem. Will it be suitable for agricultural photovoltaics?
I hope so and will do the "area check"!

Column 1
Spalte 2
* Mandatory field